欢迎您访问莱州聚峰机械有限公司网站!
点击拨打服务热线:400-879-1999
大家都在搜: 铲斗外翻 3.5吨A后侧 3.5吨A后尾

混凝土拌合机管道出现问题怎么?

来源:http://www.zkhntjbj.com/日期:2021-01-18

概述:混凝土拌合机为企业节省了人力物力,发明了巨大的经济效益,遭到各大修建商场、工程职业、房地产业的欢迎。它选用智能电气形式,选用三轴独
混凝土拌合机为企业节省了人力物力,发明了巨大的经济效益,遭到各大修建商场、工程职业、房地产业的欢迎。它选用智能电气形式,选用三轴独立控制,减少了传统复杂的机械结构,减少了传动结构,降低了故障率,更加智能化。产品混凝土拌合机在运转中,令人头痛的是一些接头的管道走漏检测或损坏。虽然这类管道在进厂前通常都经过特殊处理,但一旦呈现这种情况,整个大站仍要中止检查剖析。即使这是一个很长的路要走,你也有必要处理它。
Concrete mixer saves manpower and material resources for enterprises, invents huge economic benefits, and is welcomed by major shopping malls, engineering professions and real estate industries. It adopts intelligent electrical form and three-axis independent control, which reduces the traditional complex mechanical structure, reduces the transmission structure, reduces the failure rate and makes it more intelligent. During the operation of the product concrete mixer, the headache is the leakage detection or damage of some joints. Although this kind of pipeline usually goes through special treatment before entering the plant, once this situation occurs, the whole station still needs to stop the inspection and analysis. Even if it's a long way to go, you need to deal with it.
               混凝土拌合机
混凝土拌合机的管道问题除了漏风外,还会呈现内部阻塞。这种情况将取决于不同的地方和时节,主要是霜降后。此刻,因为夜间气温骤降,聚集在支管壁上的热水在没有干净排放的情况下,会结块成冰。次日在使用时间上,会因冰卡在管道上,造成管道阻塞,影响苏芮的运用。
In addition to air leakage, the pipe of concrete mixer will also present internal blockage. This situation will depend on different places and seasons, mainly after frost. At this moment, because of the sudden drop of temperature at night, the hot water gathered on the wall of the branch pipe will agglomerate into ice without clean discharge. The next day in the use of time, due to ice stuck in the pipeline, causing pipeline blockage, affect the use of Suri.
混凝土拌合机的主要问题是漏风。假如在作业中,听到呼吸的异响,应先把作业摆在面前,顺着呼吸从中心寻找生源。假如发现这种噪音是因为接口开裂或连接软管开裂引起的,应先中止整个平台,然后告诉相关辅导人员,以便他们派专人修理更换。不要忽视发现的缺陷,持续你的日常工作。
The main problem of concrete mixer is air leakage. If you hear the abnormal sound of breathing in your homework, you should first put your homework in front of you and follow your breathing to find the source of students from the center. If it is found that this kind of noise is caused by cracking of interface or connecting hose, stop the whole platform first, and then tell the relevant tutors, so that they can send special personnel to repair and replace it. Don't ignore the defects found, continue your daily work.
以上是混凝土拌合机管道出现问题的方式,如您想要了解更多资讯内容请多多关注我们的网站。
The above is the concrete mixer pipe problem solution, if you want to know more information, please pay more attention to our website.

截屏,微信识别二维码