水泥罐车灰罐堵塞怎么处理才好?

来源:http://www.zkhntjbj.com/日期:2021-12-22

概述:1、装料前,应检查并罐体及出料管道内的积灰和结渣等物;各管道、阀门应启闭灵活,不得有堵塞、漏气等现象;各连接部件应牢固可靠,方
1、装料前,应检查并罐体及出料管道内的积灰和结渣等物;各管道、阀门应启闭灵活,不得有堵塞、漏气等现象;各连接部件应牢固可靠,方可进行装料。
1. Before loading, check and remove the ash and slagging in the tank and discharge pipe; All pipelines and valves shall be opened and closed flexibly without blockage, air leakage, etc; All connecting parts shall be firm and reliable before loading.
2、在打开装料口前,应先打开排气阀,排除罐内残余气压。
2. Before opening the charging port, open the exhaust valve to eliminate the residual air pressure in the tank.
3、装料时,应打开料罐内料位器开关,待料位器发出满位声响信号时,应立即停止装料。
3. When loading, turn on the level switch in the charging tank, and stop loading immediately when the level gives a full sound signal.
4、装料完毕,应将装料口边缘上堆积的水泥清扫干净,盖好进料口盖,并把插销插好锁紧。
4. After loading, the cement accumulated on the edge of the loading port shall be cleaned, the feeding port cover shall be covered, and the bolt shall be inserted and locked.
5、卸料前,应将车辆停放在平坦的卸料场地,装好卸料管,关闭卸料管蝶阀和卸压管球阀,打开二次风管并接通压缩空气,保证空气压缩机在无载情况下启动。
自动上料搅拌机
5. Before unloading, the vehicle shall be parked in a flat unloading site, the unloading pipe shall be installed, the butterfly valve and ball valve of the unloading pipe shall be closed, the secondary air pipe shall be opened and the compressed air shall be connected to ensure that the air compressor is started under no load.
6、在向罐内加压时,应确认卸料阀处于关闭状态。待罐内气压达到卸料压力时,应先稍开二次风嘴阀后再打开卸料阀,并调节二次风嘴阀的开度来调整空气与水泥的比例。
6. When pressurizing the tank, confirm that the discharge valve is closed. When the air pressure in the tank reaches the discharge pressure, slightly open the secondary air nozzle valve before opening the discharge valve, and adjust the opening of the secondary air nozzle valve to adjust the optimal ratio of air to cement.
7、卸料过程中,应观察压力表压力变化情况,如压力突然上升,而输气软管堵塞,不再出料,应停止送气并放出管内压气,然后堵塞。
7. During unloading, observe the pressure change of the pressure gauge. If the pressure rises suddenly and the gas transmission hose is blocked and no longer discharging, stop the gas supply and discharge the air pressure in the pipe, and then remove the blockage.
8、卸料作业时,空气压缩机应有专人负责,其他人员不得擅自操作。在进行加压卸料时,不得改变内燃机转速。
8. During unloading operation, the air compressor shall be in the charge of a specially assigned person, and other personnel shall not operate without authorization. During pressurized unloading, the speed of the internal combustion engine shall not be changed.
9、卸料结束,应打开放气阀,放尽罐内余气,并关闭各部阀门。车辆行驶过程中,罐内不得有压力。
9. After unloading, open the vent valve, drain the residual gas in the tank, and close all valves. There shall be no pressure in the tank during vehicle driving.
10、雨天不得在露天装卸水泥。应经常检查并确认进料口盖关闭严实,不得让水或湿空气进入罐内。
10. Cement shall not be loaded and unloaded in the open air in rainy days. Frequently check and confirm that the feed inlet cover is closed tightly, and water or wet air shall not enter the tank.
11、在车底下进行保养、检修时,应将内燃机熄火、拉紧手制动器并将车轮楔牢。
11. During maintenance and overhaul under the vehicle bottom, shut down the internal combustion engine, tighten the hand brake and wedge the wheels firmly.
12、水泥罐车经修理后需要试车时,应由合格人员驾驶,车上不得载人、载物,当需在道路上试车时,应挂交通管理部门颁发的试车牌照。
12. When the cement tank truck needs to be tested after repair, it shall be driven by qualified personnel, and the vehicle shall not carry people or objects. When it needs to be tested on the road, it shall be hung with the test license issued by the traffic management department.
13、在坡道上停放时,下坡停放应挂上倒档,上坡停放应挂上一档,并应使用三角木楔等塞紧轮胎。
13. When parking on the ramp, reverse gear shall be engaged for downhill parking, first gear shall be engaged for uphill parking, and triangular wooden wedge shall be used to plug the tire.